Clean room provider today? This specification is created to implement important national guidelines and rules, creating standard construction acceptance requirements, unify testing strategies, and ensure project high quality, save additional energy, protect the environment and safe operation during the construction of clean rooms (including prefabricated clean rooms, the same below). This specification is applicable to the construction and acceptance of newly-built and reconstructed industrial clean rooms and general biological clean rooms, and is not applicable to the construction and acceptance of special biological clean rooms with biological safety requirements. Discover additional information on clean room standard.
The clean room must be realized according to the design plans. If the design needs to be modified during construction, there shall be a change notice from the design unit. Construction and acceptance cannot be carried out without drawings and technical requirements. Before the construction of the clean room, a detailed construction scheme and procedures shall be formulated. During the construction, all types of work shall cooperate closely and construct according to the procedures. The type of work constructed first shall not hinder the subsequent construction.
Cleanroom workshop take the control of inanimate particles as the object. Mainly control the pollution of the living objects with living particles to the outside situation and people. The negative pressure inside the atmosphere must be maintained. it’s suitable for bacteriology, biology, clean laboratory, physical engineering, recombinant genes, vaccine preparation. In order to know your requirement, please fill the following table carefully and supply CAD layout, so that we can provide correct scheme and quotation, thank you!
The main materials, equipment, finished products and semi-finished products used in the project shall comply with the design regulations, and shall be provided with factory certificate or quality appraisal certificate. When there is doubt about the quality, it must be inspected. Expired materials shall not be used.
Obstacles such as work desks in the clean room will have eddy currents at the junctions, and the cleanliness will be relatively poor near them. Drilling air return holes on the work desks will minimize eddy currents; assembly Whether the selection of materials is appropriate and whether the equipment layout is perfect are also important factors for whether the airflow becomes a vortex phenomenon. The above introduction is related to clean room and airflow influencing factors.
During the construction of the clean room, the intermediate inspection and acceptance shall be carried out after the construction of each process, and the records shall be put on record. In addition to this specification, the construction and acceptance of the clean room shall also comply with the provisions of the current relevant national standards.The architectural decoration construction of the clean room shall be carried out after the completion of the roof waterproof works and the external enclosure structure, the installation of the external doors and windows, and the acceptance of the main structure.
For the unidirectional flow (laminar flow) clean room, the air supply volume is determined by the product of the average wind speed of the room section and the cross-sectional area, in which the measured section of the vertical unidirectional flow (laminar flow) clean room is the horizontal section 0.8m away from the ground; The horizontal unidirectional flow (laminar flow) clean room takes a vertical section 0.5m away from the air supply surface. The spacing of measuring points on the section shall not be greater than 2m, and the number of measuring points shall not be less than 10, which shall be evenly arranged. Hot bulb anemometer for instrument.
Its contents include the indoor decoration works, the installation of doors and windows, the gap sealing, as well as the sealing of the joints between various pipelines, lighting lamps, purification Suzhou Pharma is one of the leading turnkey project providers for pharmaceutical, food, herbal, cosmetic, electronics factory and chemical plants. We offer projects as per GMP regulations. As being pioneers in this field, the solutions from Suzhou Pharma is readily accepted by the customers.
The clean room is generally made of foam color steel or rock wool board with a vertical wall and an independent air-conditioning air supply system. The air is filtered through high-efficiency three-stage filtration in junior high schools. The personnel and materials are equipped with an air shower room and a transfer window for clean filtration.
The above introduction is related to the introduction of clean room and testing purpose.If you have different opinions or suggestions, you can always contact us.As long as you want the clean room project, Suzhou Pharma Machinery Co., Ltd. will realize it for you.Choose a reliable engineering company, Suzhou Pharma Machinery Co., Ltd., will be responsible for your project to the end, and the reputation is guaranteed.Our company has completed 500+ clean room projects all over the world. Many new and old customers like to buy the products they want in our company. The price is reasonable, the integrity is guaranteed, and the after-sales service is good.If you have related (clean room) projects recently, you can contact us at any time. Find additional details at https://www.sz-pharma.com/.